Projects

"Bakhvi 3" HPP

Development of the Detailed Project of “Bakhvi 3” HPP (10 MW) – (Partners: “Rotterman Georgia” and “K.G. Energy”

"Bakuriani" HPP

Development of the project of “Bakuriani” HPP for energy supply of the Baku-Tbilisi-Ceyhan Pipeline’s Kodiana Security Base(British Petroleum Company, BP

"Shenako" HPP

Development of the “Shenako” HPP project (Client: Non-governmental organization “Union for Development of High Mountain Regions of Georgia”).|Contract dated April 5, 2006 between organization “Union for Development of High Mountain Regions of Georgia” and GHP Ltd.

"Rustavi" HPP

Development of the Feasibility Study of “Rustavi” HPP (10 MW) – (Designed on GHP-s own initiative together with the Italian Company “Sorgent.e, s.r.l.” (Padua).)|Designed on GHP-s own initiative together with the Italian Company “Sorgent.e, s.r.l.” (Padua).

"Natanebi" HPP

Development of the Feasibility Study of “Natanebi” HPP (12 MW) , (Designed on GHP-s own initiative).|Designed on GHP-s own initiative.

"Enguri" HPP

Enguri HPP’s power intake slope protection measures Project – (Client: “Enguri & Company” Ltd, Director Mr. Gia Cimentia).|Contract dated February 20, 2008 between “Enguri & Company” Ltd and GHP Ltd.

"Mtispiri" HPP

Development of the Construction Project of Mtispiri HPP (Bakhvi 3 HPP) on the River Bakhvistskali in Ozurgeti region. Partnership Agreement between « Rotterman Georgia» Ltd and «Georgian Hydro Power » Ltd|Dated 15.01.2009

"Ritseula" HPP

Ritseula HPP (17 MW) Construction Detailed Project (Ambrolauri region) – Client “Georgian International Energy Corporation” Ltd.|Contract dated 26.04.2010|

Rehabilitation of “Chirukhi-Sanalia” HPP

Ensuring equipment delivery, installation and commissioning works for Complete Rehabilitation of “Chirukhi-Sanalia” HPP, (Client: Ministry of Energy of Georgia)|Agreement №30.04-12-g dated December 10, 2004 between Ministry of Energy of Georgia and GHP Ltd.

Manufacture, rehabilitation and installation of the Pelton type turbine for “Bzhuzha” HPP

Manufacture, rehabilitation and installation of the Pelton type turbine for “Bzhuzha” HPP (4 MW) – (Client: HPP Administration, Director Mr. Tengiz Gogelia)|Contract dated September 17, 2006 between “Bzhuzha” HPP Administration and GHP Ltd.

Design of Temporary Dam along the Diversion Canal of "Vartsikhe" HPP

Design of Temporary Dam along the Diversion Canal of “Vartsikhe HPP” – (Client: Ministry of Energy of Georgia)|Agreement №129.14.09-8293 dated September 27, 2005 between Ministry of Energy of Georgia and GHP Ltd.

Development of project of Rehabilitation of the Damaged Metal-Backed Revetment for Draught Tube of “Gumati-I” HPP’s Hydraulic Unit №3

Development of project of Rehabilitation of the Damaged Metal-Backed Revetment for Draught Tube of “Gumati-I” HPP’s Hydraulic Unit №3 and execution of construction works using of know-how of Norwegian company “Elkem” (Client: HPP Administration, Director Mr. Ramaz Urekadze)|Contract dated October 10, 2006 and Contract dated October 22, 2006 between “Gumati-I” HPP Administration and GHP Ltd.

„AtsHPP

Development of the project of Electrical Part and Automation Control System for “AtsHPP” (16 MW) – (Client: HPP Administration, Director Mr. Shota Bolkvadze)|Contract dated December 20, 2006 between “AtsHPP” Administration and GHP Ltd.

Balancing and commissioning works for the Control System of “Khrami-II” HPP’s hydraulic unit №2

Balancing and commissioning works for the Control System of “Khrami-II” HPP’s hydraulic unit №2 (60 MW) together with company “Siemens” (Client: Administration of “Energy Generation”, Director Mr. Giorgi Trokashvili).|Contract dated August 2, 2006 between “Energy Generation” and GHP Ltd.

Ritseula SHP Rehabilitation

Ritseula SHP Rehabilitation Detailed Project (Ambrolauri region) – Client “Georgian International Energy Corporation” Ltd.|Contract dated 26.04.2010.

Geotechnical Investigation and Detailed Design Services for the Baku-Tbilisi-Ceyhan Pipeline’s Kodiana Security Base

Geotechnical Investigation and Detailed Design Services for the Baku-Tbilisi-Ceyhan Pipeline’s Kodiana Security Base (Kodiana Sector; Borjomi region) meant for 200 soldiers – (Client: BTC Pipeline Company). BTC Pipeline Company’s Service Order №S-05-BTC-86807 dated August 4, 2005 addressed to GHP Ltd.|BTC Pipeline Company’s Service Order №S-05-BTC-86807 dated August 4, 2005 addressed to GHP Ltd.

Development of the project of Improvement of Central Waste Accumulation Area (CWAA) for Pump Station of the Baku-Tbilisi-Ceyhan Pipeline’s Gardabani Sector

Development of the project of Improvement of Central Waste Accumulation Area (CWAA) for Pump Station of the Baku-Tbilisi-Ceyhan Pipeline’s Gardabani Sector (PSG1) – (Clients: BTC Pipeline Company and South Caucasus Pipeline)|BTC Pipeline Company’s Service Order №S-07-BTC-132871 dated June 7, 2007 (BTC Split) and South Caucasus Pipeline Company’s Service Order №S-07-SCPC-132872 dated June 7, 2007 (SCPC Split), addressed to GHP Ltd.

Development of the project of Provision of Potable Water for the Security Base (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline

Development of the project of Provision of Potable Water for the Security Base (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline – (Client: BTC Pipeline Company)|Call-Off Order №OIT-005 dated December 08, 2006 and Call-Off Order №OIT-008 dated September 29, 2007 (based on Call-Off Agreement №A-06-BTC-105868 dated June 14, 2006 between BTC Pipeline Company and GHP Ltd.

Provision of Engineering Services for Kodiana Emergency Drain Down Facility (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline

Provision of Engineering Services for Kodiana Emergency Drain Down Facility (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline – (Client: BTC Pipeline Company).|Contract № C-08-BTC-167927 dated October 20, 2008 between BTC Pipeline Company and GHP Ltd.

Structural and Electrical Engineering designs and Drawings for Rustavi Landfill

Provision of Civil, Structural and Electrical Engineering designs and Drawings for Rustavi Landfill – (Client: BTC Pipeline Company).|Order № LVS-09-BTC-178469; Order date: 15.04.2009

Ecological research for pumping station (PSG-I and PSG-II)

Ecological research for pumping station (PSG-I and PSG-II) to be built in Gardabani and Tetritskaro regions – (Client – “SPIE-Capag s.a./Petrofac International Ltd ”)|Contract dated June 4, 2003 between SPIE-Capag s.a./Petrofac International Ltd and GHP Ltd.

Geotechnical investigation and Detailed Project of the Secondary Containment CPO Buildings

Geotechnical investigation and Detailed Project of the Secondary Containment CPO Buildings – (Client: BTC Pipeline Company).|Order № LVS-09-BTC-179656; Order date: 04.05.2009

Participation in elaboration of the Program for Harness of Georgian Hydro Potential and of the Tax Remission Bill

Participation in elaboration of the Program for Harness of Georgian Hydro Potential and of the Tax Remission Bill (cause: Decree of the Prime-Minister of Georgia).|Decree №34 of the President of Georgia Mr. E.Shevardnadze dated January 11, 2002 and the appropriate Order №9 of the State Minister of Georgia Mr. A. Jorbenadze dated February 11, 2002.

Expertise of the project of “Gudauri” HPP (8MW) and development the Investment Proposal

Expertise of the project of “Gudauri” HPP (8MW) and development the Investment Proposal – (Client: Israel-Georgian Joint Venture represented by its Director, Mr. Teimuraz Kvatadze)|Letter № 550224505 of Mr. Roman Bronfman, Executive President of the Company “NR Vision”.

"Alazani 2" HPP

Alazani 2 HPP Construction Detailed Project (Gurjaani region, v.Vejini) – Client “Georgian International Energy Corporation” Ltd.|Contract dated 25.12.2009

"Kalova" HPP

Kalova HPP. Detailed Project Design|Client: Construction Company “Oktan-Medea” Ltd, Batumi. Contract 18.03.2010

Preparation of the Contract with Austria-Germany company “Voith-Siemens” on delivery of turbine for “Shaori” HPP

Preparation of the Contract with Austria-Germany company “Voith-Siemens” on delivery of turbine for “Shaori” HPP (Client – JSC “Sakenergoremonti”)|Contract dated June 10, 2005 between “Sakenergoremonti” and GHP Ltd.

Ensuring equipment delivery, installation and commissioning works for Complete Rehabilitation of “Chirukhi-Sanalia” HPP

Ensuring equipment delivery, installation and commissioning works for Complete Rehabilitation of “Chirukhi-Sanalia” HPP, (Client: Ministry of Energy of Georgia).|Agreement №30.04-12-g dated December 10, 2004 between Ministry of Energy of Georgia and GHP Ltd.

Development of the Project Documentation of Complete Rehabilitation of “Chirukhi-Sanalia” HPP

Development of the Project Documentation of Complete Rehabilitation of “Chirukhi-Sanalia” HPP (Client – Ministry of Energy of Georgia).|Agreement №16.04-s-C dated September 6, 2004 between Ministry of Energy of Georgia and GHP Ltd.

Development of the Rehabilitation Project for “Ritseula” HPP

Development of the Rehabilitation Project for “Ritseula” HPP (12 MW) – (Client: Winrock International Institute, USA).|Sub-Recipient Agreement №5596-07-07 dated April 16, 2007 between Winrock International Institute for Agricultural Development and GHP Ltd.

Design of Electrical Part of 3rd Unit of “Gumati” HPP

Design of Electrical Part of 3rd Unit of “Gumati” HPP – (Client: Energo-Pro, JSC)|Contract №308-4/7 dated December 11, 2007 between Energo-Pro, JSC and GHP Ltd.

Rehabilitation and installation of the Pelton type turbine (2 buckets) for "Bzhuzha" HPP

Rehabilitation and installation of the Pelton type turbine (2 buckets) for “Bzhuzha” HPP (4 MW) – (Client: HPP Administration, Director Mr. Tengiz Gogelia).|Contract dated May 25,2008 between “Bzhuzha” HPP Administration and GHP Ltd.

Rehabilitation and installation of the Pelton type turbine (19 buckets) for "Bzhuzha" HPP

Rehabilitation and installation of the Pelton type turbine (19 buckets) for “Bzhuzha” HPP (4 MW) – (Client: HPP Administration, Director Mr. Tengiz Gogelia).|Agreement dated October 30, 2008 about Contract dated May 25, 2008 between “Bzhuzha” HPP Administration and GHP Ltd.

"Alazani 1" HPP Rehabilitation

“Alazani 1” HPP Rehabilitation Detailed Project (Gurjaani region, v.Vejini) – Client “Georgian International Energy Corporation” Ltd.|Contract dated 25.12.2009.

Engineering Services for Baku-Tbilisi-Ceyhan Pipeline’s Kodiana Security Base

Engineering Services for Baku-Tbilisi-Ceyhan Pipeline’s Kodiana Security Base upon necessity (Kodiana Sector; Borjomi region) – (Client: BTC Pipeline Company)|Call-Off Agreement №A-06-BTC-105868 dated June 14, 2006 between BTC Pipeline Company and GHP Ltd.

Baku-Tbilisi-Ceyhan Pipeline

Development of the project of Provision of Sewage Treatment at the Security Base (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline (Client: BTC Pipeline Company)|Call-Off Order №OIT-006 dated December 20, 2006 (based on Call-Off Agreement №A-06-BTC-105868 dated June 14, 2005 between BTC Pipeline Company and GHP Ltd.

Development of the project of Emergency Drain down Facility for the Baku-Tbilisi-Ceyhan Pipeline Sector

Development of the project of Emergency Drain down Facility for the Baku-Tbilisi-Ceyhan Pipeline Sector – (Client: BTC Pipeline Company)|Contract №C-07-BTC-137737 dated August 8, 2007 between BTC Pipeline Company and GHP Ltd.

Redesign of the Emergency Drain Down Facility (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline

Redesign of the Emergency Drain Down Facility (Kodiana Sector; Borjomi region) of the Baku-Tbilisi-Ceyhan Pipeline – (Client: BTC Pipeline Company).|Contract № S-08-BTC-155112 dated April 11, 2008 between BTC Pipeline Company and GHP Ltd.

Order covers service for designing of water treatment pland and enclosure for EDDF site - (Client: BTC Pipeline Company).|Order № LVS-09-BTC-175776; Order date: 25.02.2009​

Dr is raised in order to cover the service cost of GHP for the design of five (5) (CPO)

Dr is raised in order to cover the service cost of GHP for the design of five (5) each Control and Power Outstations (CPO) buildings and outside site arrangements, where power and control systems shall be installed for the sluice gates operation – (Client: BTC Pipeline Company).|Order № LVS-09-BTC-176697; Order date: 12.03.2009

Order covers service for designing of water treatment plant and enclosure for EDDF site - (Client: BTC Pipeline Company).|Order № LVS-09-BTC-175776; Order date: 25.02.2009

Engineering-geological exploration for construction of the quarters for Krtsanisi military unit

Engineering-geological exploration for construction of the quarters for Krtsanisi military unit (Client – Turkish company “AKS Teknik”)|Contract dated August 12, 2003 between AKS Teknik and GHP Ltd.

Development of the project of Provision of Electricity Supply for Tusheti Region by means of Small HPP and Transmission Lines

Development of the project of Provision of Electricity Supply for Tusheti Region by means of Small HPP and Transmission Lines (Omalo HPP, Dartlo HPP, Chesho HPP, Jvarbosela HPP) – (Client: Ministry of Energy of Georgia).|Contract №98-02.09-8303 dated September 17, 2007 between Ministry of Energy of Georgia and GHP Ltd.

Preparation of Inspection Acts needed for Rehabilitation of Gumati-1 HPP, Gumati-2 HPP, Shaori HPP and Dzevrula HPP

Preparation of Inspection Acts needed for Rehabilitation of Gumati-1 HPP, Gumati-2 HPP, Shaori HPP and Dzevrula HPP as well as of the Tender Documents for their Electromechanics Rehabilitation – (Client: Ministry of Energy of Georgia).|Agreement №01/02-s-d dated February 23, 2005 between Ministry of Energy of Georgia and GHP Ltd.